Groundwater Monitoring and Plume Maps
Groundwater Monitoring Program
Groundwater monitoring and sampling activities at the Hinkley site are being conducted in compliance with Cleanup and Abatement Orders (CAO), Waste Discharge Requirements, and other directives issued by the California Regional Water Quality Control Board, Lahontan Region (Water Board). The purpose of the GMP is to collect data to observe and document water quality conditions and groundwater flow patterns at the site. The GMP wells are sampled in quarterly, semiannual, and annual monitoring events. The most recent regulatory update to the GMP was prescribed in CAO No. R6V‐2008‐0002, issued August 6, 2008, and amended on November 12, 2008 (CAO No. R6V‐2008‐0002A1), April 7, 2009 (CAO No. R6V‐2008‐0002A2), and March 14, 2012 (CAO No. R6V‐2008‐0002A3). CAO No. R6V‐2008‐0002 and its amendments are collectively referred to herein as the 2008 CAO. The 2008 CAO specified which monitoring wells would be sampled and the sampling frequency for the GMP (effective August 2008). On September 29, 2011, the Water Board issued Investigative Order No. R6V‐2011‐0079, requiring PG&E to provide additional information in quarterly groundwater monitoring reports. On March 14, 2012, the Water Board issued amended 2008 CAO No. R6V‐2008‐0002A3. Section III.9(a) of the Amended CAO requires PG&E to operate the existing groundwater extraction system or equivalent (as of January 15, 2012) to maintain hydraulic capture of the chromium plume within specified targeted areas on a year‐round basis. Section III.9(b) of the Amended CAO also requires PG&E to collect groundwater elevation data from select monitoring wells and piezometers and to provide a monthly evaluation data report. Separate reports documenting hydraulic control of the specified targeted areas are submitted to the Water Board by the 15th day of the month following the monitoring period.Related Documents
- 05/03/2023 – 1st Quarter 2023 Plume Map
- 01/18/2023 – 4th Quarter 2022 Plume Map
- 10/12/2022 – 3rd Quarter 2022 Plume Map
- 08/03/2022 – 2nd Quarter 2022 Plume Map
- 04/27/2022 – 1st Quarter 2022 Plume Map
- 01/19/2022 – 4th Quarter 2021 Plume Map
- 08/10/2021 – 3rd Quarter 2021 Plume Map
- 07/15/2021 – 2nd Quarter 2021 Plume Map
- 04/14/2021 – 1st Quarter 2021 Plume Map
- 02/02/2021 – 4th Quarter 2020 Plume Map
- 10/05/2020 – 3rd Quarter 2020 Plume Map
- 07/02/2020 – 2nd Quarter 2020 Plume Map
- 07/22/2020 – 1st Quarter 2020 Plume Map
- 01/17/2020 – 4th Quarter 2019 Plume Map
- 10/14/2019 – 3rd Quarter 2019 Plume Map
- 07/09/2019 – 2nd Quarter 2019 Plume Map
- 05/02/2019 – 1st Quarter 2019 Plume Map
- 02/04/2019 – 4th Quarter 2018 Plume Map
- 10/16/2018 – 3rd Quarter 2018 Plume Map
- 08/09/2018 – 2nd Quarter 2018 Plume Map
- 05/10/2018 – 1st Quarter 2018 Plume Map
- 02/05/2018 – 4th Quarter 2017 Plume Map
- 11/10/2017 – 3rd Quarter 2017 Plume Map
- 08/10/2017 – 2nd Quarter 2017 Plume Map
- 04/25/2017 – 1st Quarter 2017 Plume Map
- 01/23/2017 – 4th Quarter 2016 Plume Map
- 10/31/2016 – 3rd Quarter 2016 Plume Map
- 07/27/2016 – 2nd Quarter 2016 Plume Map
- 05/05/2016 – 1st Quarter 2016 Plume Map
- 02/12/2016 – 4th Quarter 2015 Plume Map
- 10/12/2015 – 3rd Quarter 2015 Plume Map
- 07/22/2015 – 2nd Quarter 2015 Plume Map
- 04/28/2015 – 1st Quarter 2015 Plume Map
- 01/26/2015 – 4th Quarter 2014 Plume Map
- 11/05/2014 – 3rd Quarter 2014 Plume Map
- 07/28/2014 – 2nd Quarter 2014 Plume Map
- 04/25/2014 – 1st Quarter 2014 Plume Map
- 01/31/2014 – 4th Quarter 2013 Plume Map
- 12/12/2013 – PG&E’s Response to 3rd Quarter 2013 Plume Map
- 10/31/2013 – 3rd Quarter 2013 Plume Map
- 07/31/2013 – 2nd Quarter 2013 Plume Map
- 04/30/2013 – 1st Quarter 2013 Plume Map
- 04/15/2013 – IRP Manager’s Evaluation of the Performance of the Northwest Freshwater Injection System
- 02/03/2013 – 4th Quarter 2012 Plume Map
- 01/14/2013 – Conceptual Site Model for Groundwater Flow and the Occurrence of Chromium in Groundwater of the Western Area Pacific Gas and Electric Company Hinkley Compressor Station, Hinkley, California
